Show simple item record

dc.contributor.authorMohd Fidzwan, Md Amin Hamzas
dc.contributor.authorAhmad Bareduan, Salleh
dc.contributor.authorMohd Sabri, Hussin
dc.contributor.authorM. J., Hasnul
dc.contributor.authorAsmawi, Sanuddin
dc.contributor.authorZailani, Zainal Abidin
dc.date.accessioned2013-06-27T05:08:08Z
dc.date.available2013-06-27T05:08:08Z
dc.date.issued2012-09
dc.identifier.citationInternational Review of Mechanical Engineering, vol. 6(6), 2012, pages 1253-1256en_US
dc.identifier.issn1970-8734
dc.identifier.urihttp://www.praiseworthyprize.com/IREME-latest/IREME_vol_6_n_6.html
dc.identifier.urihttp://dspace.unimap.edu.my/123456789/26277
dc.descriptionLink to publisher's homepage at http://www.praiseworthyprize.iten_US
dc.description.abstractThis project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were identified as M3 and it utilized makespan algorithms to identify bottleneck categories. Using these conditions, a new bottleneck based heuristic which called BB is developed and tested using Macro Programming in Microsoft Excel. The main objective of this project is to evaluate the performance of M3 bottleneck-based heuristic for M1M2M3 flow shop problems. A total of 3000 simulations were conducted using randomly data in order to evaluate the accuracy of the heuristic. The heuristic performance was evaluated for six and ten job problems. The dominance level groups are divided into levels of weak, medium and strong dominance. For each job problem, the BB results were compared against the results of complete enumeration and lower bound analysis. The results suggested that BB heuristic is very effective in solving scheduling problems within the strong P3 dominance level rangeen_US
dc.language.isoenen_US
dc.publisherPraise Worthy Prize S.r.l.en_US
dc.subjectBottlenecken_US
dc.subjectFlow shopen_US
dc.subjectHeuristicen_US
dc.subjectSchedulingen_US
dc.titlePerformance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shopen_US
dc.typeArticleen_US