dc.description.abstract | This case study is done in one of the automotive industry in Malaysia. It took place
at the Logistic Department. Current layout design and manpower distribution is improved
to reduce the gap between Cycle Time and plan manpower quantity and to match the Cycle
Time with actual allocated manpower quantity with the help of new layout design. The
improvement is done by collecting data at the selected automotive industry and followed by
series of analysis. The warehouse layout is done to improve the production layout using
AutoCAD 2005 and Microsoft Excel 2007 software. The data based on new layout is
computed by Cycle Time equation to determine the cycle time, total needed manpower and
manpower efficiency. The result of calculation is analyzed and improvement process is
done to achieve objectives. The result of improvement is presented by graph of manpower
efficiency that shows comparison before and after improvement for each section. Section
involved is CKD, Hako (CKD) and Local area. At the end of this case study, new layout is
designed at CKD area, manpower efficiency is increased and manpower quantity is
reduced. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universiti Malaysia Perlis | en_US |
dc.subject | Automotive industry | en_US |
dc.subject | Manpower | en_US |
dc.subject | Cycle time | en_US |
dc.title | Case study on improvement of cycle time for the logistic design layout in automative industry | en_US |