Search
Now showing items 1-3 of 3
An improvement study of outgoing materials handling at Perodua Engine Manufacturing Sdn. Bhd. (PEMSB) Plant in Sg Choh Rawang, Selangor
(Universiti Malaysia Perlis, 2009-05)
An outgoing material handling improvement conducted in Perodua Engine
Manufacturing Sdn. Bhd. (PEMSB) plant in Sg. Choh Rawang applies engineering
theoretical knowledge into practice. Integration of both Toyota Production ...
Balancing and optimization using simulation modeling in healthcare services
(Universiti Malaysia Perlis, 2009-04)
The emergency department in every hospital deals with life and death situation every
day. However, due to non-value added activities, long queues and inefficiency in
treatment for patients are increased. The application ...
Difference of quality technique and how it been adopted
(Universiti Malaysia Perlis, 2009-05)
This project is conducted in order to know the differences between quality techniques and how it been adopted in industry. The quality techniques selected are Lean Manufacturing, Total Quality Management and Six Sigma. The ...