Risk assessment visualization tool using probabilistic model
Abstract
In our previous paper, we discussed
on the visualization tool that we want to construct
is based on traditional software development
process model so called “Waterfall Model”. The
waterfall model is chosen because this model has
a clear objective where each process takes the
input from the previous step. Also, in the previous
paper we showed the proposed framework and
structured approach for this tool. As overall, the
objective of this research is to construct a
visualization tool for software risk assessment for
all phases in software development processes. As
a continuation of this research, this paper will
discuss on the probabilistic model that will be
implemented in planning and requirement phase
in the proposed tool.
Collections
- Conference Papers [2599]