dc.contributor.author | Mohamad Fathi, Mohamad Radzuan | |
dc.date.accessioned | 2015-12-11T08:12:09Z | |
dc.date.available | 2015-12-11T08:12:09Z | |
dc.date.issued | 2014-06 | |
dc.identifier.uri | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/40652 | |
dc.description | Access is limited to UniMAP community. | en_US |
dc.description.abstract | It is an expert system to control construction problems in rigid highway
pavements. It is a one of alternative it can give a help and solution to control a
construction problem and also this system can save a time in the construction work and
maintenance work in the future. The situation was when the contractor doing the
construction, this system can be a reference to make sure that any problem can be
solved faster and do not need to find in internet and journals. This system is from
America Concrete Institute (ACI) standard, and this standard is been use in Malaysia.
This system is be made from VISUAL BASIC software version 2008. This system is
very easy to use even the beginner. When this system is running, users can determine
the types of construction problems. The data information about the construction
problem is coming out together with the solution about the problem follow what the
users choose. Users can use the data information and solution to relate in the real
problem situation at site. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universiti Malaysia Perlis (UniMAP) | en_US |
dc.subject | Expert system | en_US |
dc.subject | Rigid highway pavements | en_US |
dc.subject | Risk | en_US |
dc.subject | Construction -- Highway | en_US |
dc.title | An expert system to control construction problem In rigid highway pavement | en_US |
dc.type | Learning Object | en_US |
dc.contributor.advisor | Syakirah Afiza Mohammed | en_US |
dc.publisher.department | School of Environmental Engineering | en_US |