• Login
    View Item 
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Critical review on site conventional system: request for inspection (RFI) paper foam

    Thumbnail
    View/Open
    Abstract, Acknowledgement.pdf (259.2Kb)
    Introduction.pdf (242.8Kb)
    Literature Review.pdf (233.5Kb)
    Methodology.pdf (734.9Kb)
    Results and discussion.pdf (565.4Kb)
    Conclusion.pdf (866.2Kb)
    Reference and appendix.pdf (230.3Kb)
    Date
    2013-06
    Author
    Mohd Najmi Muttaqin, Mohd Nasir
    Metadata
    Show full item record
    Abstract
    Request For Inspection (RFI) is form that very synonym in site construction. It is used in every single step of construction such as to construct basement of the building. This form will be used in 3 phase of the construction, that is before the do construct, while constructing, and after constructed. As an example to concrete a beam of the building, the sub-contractor must put the signature on the form an evidence of the inspection after check the works are followed by checklist. Then the form must be approved by the main contractor. The main contractor must make sure every checklist statement in the form has been followed by the sub-contractor, so the main contractor will re-check it on the site. The last part of this form is it will submit to consultant. The consultant will be certified this form after all the things are followed by checklist. The RFI is very use full to guide the construction follow the specification needed but the way it use or how it use is the matter that be issued. According of this, the form has been made into Computer Aided Program (CAP) which is made into website. So this will help to improve the effectiveness in construction. This research were made only in Perlis state by using the questionnaire had been responded by 212 respondents from site construction, supplier, main office, Majlis Perbandaran Kangar, Jabatan Kerja Raya, CIDB, and many departments which involved in this form. From this research, it can be concluded that this RFI form is better by made into CAP due to their more effectiveness in the construction and most of respondents were agreed about this.
    URI
    http://dspace.unimap.edu.my:80/xmlui/handle/123456789/39177
    Collections
    • School of Environmental Engineering (FYP) [638]

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback
     

     

    Browse

    All of UniMAP Library Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback