Title: Development of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4
Authors: Mohd Fidzwan, Md Amin Hamzas
Ahmad Bareduan, Salleh
Liyana, Tajul
Mohd Sabri, Hussin
Zailani, Zainal Abidin
Hasnul, Hadi
fidzwan@unimap.edu.my
Keywords: Bottleneck
Heuristic
Re-Entrant flowshop
Scheduling
Issue Date: Mar-2012
Publisher: Praise Worthy Prize S.r.l.
Citation: International Review of Mechanical Engineering, vol. 6(3), 2012, pages 501-506
Abstract: This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 where M1 and M4 have high tendency of being dominant machine. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were identified as M1 and combinations of M4+M3+M4 and it utilized two makespan algorithms to identify bottleneck categories. Each algorithm was only valid under several conditions identified as absolute bottleneck conditions. Using these conditions, a new bottleneck based heuristic which called NH is developed and tested using Macro Programming in Microsoft Excel. A total of 3000 simulations were conducted using randomly data in order to evaluate the accuracy of the heuristic. The heuristic performance was evaluated for six and ten job problems. The dominance level groups are divided into levels of weak, medium and strong dominance. For each job problem, the NH results were compared with previously developed absolute bottleneck adjacent matching (ABAM) heuristic. For six job problems, it was shown that the NH performances at medium dominance level are better than ABAM. For ten job problems, the result indicated that NH only produced better result than ABAM at the strong dominance level.
Description: Link to publisher's homepage at http://www.praiseworthyprize.com/
URI: http://www.praiseworthyprize.com/IREME-latest/IREME_vol_6_n_3.html#Development_of_Improved_Bottleneck-based_Heuristic_for_Re-entrant_Flow_Shop_with_Dominant_Machine_at_M1_and_M4
http://dspace.unimap.edu.my/123456789/26404
ISSN: 1970-8734
Appears in Collections:School of Manufacturing Engineering (Articles)
Mohd Sabri Hussin
Mohd Fidzwan Md Amin Hamzas, Encik

Files in This Item:
File Description SizeFormat 
Development of improved bottleneck.pdf31.06 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.