DC FieldValueLanguage
dc.contributor.authorMohd Fidzwan, Md Amin Hamzas-
dc.contributor.authorAhmad Bareduan, Salleh-
dc.contributor.authorLiyana, Tajul-
dc.contributor.authorMohd Sabri, Hussin-
dc.contributor.authorZailani, Zainal Abidin-
dc.contributor.authorHasnul, Hadi-
dc.date.accessioned2013-07-02T06:32:36Z-
dc.date.available2013-07-02T06:32:36Z-
dc.date.issued2012-03-
dc.identifier.citationInternational Review of Mechanical Engineering, vol. 6(3), 2012, pages 501-506en_US
dc.identifier.issn1970-8734-
dc.identifier.urihttp://www.praiseworthyprize.com/IREME-latest/IREME_vol_6_n_3.html#Development_of_Improved_Bottleneck-based_Heuristic_for_Re-entrant_Flow_Shop_with_Dominant_Machine_at_M1_and_M4-
dc.identifier.urihttp://dspace.unimap.edu.my/123456789/26404-
dc.descriptionLink to publisher's homepage at http://www.praiseworthyprize.com/en_US
dc.description.abstractThis project investigates the possibility of developing scheduling heuristic using bottleneck approach for a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 where M1 and M4 have high tendency of being dominant machine. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were identified as M1 and combinations of M4+M3+M4 and it utilized two makespan algorithms to identify bottleneck categories. Each algorithm was only valid under several conditions identified as absolute bottleneck conditions. Using these conditions, a new bottleneck based heuristic which called NH is developed and tested using Macro Programming in Microsoft Excel. A total of 3000 simulations were conducted using randomly data in order to evaluate the accuracy of the heuristic. The heuristic performance was evaluated for six and ten job problems. The dominance level groups are divided into levels of weak, medium and strong dominance. For each job problem, the NH results were compared with previously developed absolute bottleneck adjacent matching (ABAM) heuristic. For six job problems, it was shown that the NH performances at medium dominance level are better than ABAM. For ten job problems, the result indicated that NH only produced better result than ABAM at the strong dominance level.en_US
dc.language.isoenen_US
dc.publisherPraise Worthy Prize S.r.l.en_US
dc.subjectBottlenecken_US
dc.subjectHeuristicen_US
dc.subjectRe-Entrant flowshopen_US
dc.subjectSchedulingen_US
dc.titleDevelopment of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4en_US
dc.typeArticleen_US
dc.contributor.urlfidzwan@unimap.edu.myen_US
Appears in Collections:School of Manufacturing Engineering (Articles)
Mohd Sabri Hussin
Mohd Fidzwan Md Amin Hamzas, Encik

Files in This Item:
File Description SizeFormat 
Development of improved bottleneck.pdf31.06 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.