Show simple item record

dc.contributor.authorUmol Syamsyul, Rakiman
dc.contributor.authorAbdul Talib, Bon, Prof. Dr.
dc.date.accessioned2013-08-05T00:53:44Z
dc.date.available2013-08-05T00:53:44Z
dc.date.issued2012-11-20
dc.identifier.citationp. 189-194en_US
dc.identifier.urihttp://dspace.unimap.edu.my/123456789/27359
dc.descriptionMalaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis.en_US
dc.description.abstractThis paper intend to analyze a new production line in a metal stamping company based on the complain from the company and try to explore the better layout or arrangement in the production line in reflect to the complained problem and constrain of the provided of accept the defect and repair inspection policy. The production line is first being analyzed in response to complain through computer simulation. After the problem had been identified, the researcher tried different alternatives in the attempt to seek for the better layout or arrangement in the production line in regard of the inspection station allocation. The effect of different inspection station allocation layout is then being evaluated in term of the production time. After reducing the number of inspection station, interesting enough, the production time does not seem to decrease but increased. This finding contradicts the conventional thought of fewer stations means shorter time. This finding could be the founding basic in the future research regarding the allocation of the inspection station following certain provided policy. This is also very helpful in real life practice in company as to help them improve their production time.en_US
dc.language.isoenen_US
dc.publisherMalaysian Technical Universities Network (MTUN)en_US
dc.relation.ispartofseriesProceeding of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012en_US
dc.subjectProduction lineen_US
dc.subjectProModelen_US
dc.subjectInspectionen_US
dc.titleProduction line: Effect of different inspection station allocationen_US
dc.typeWorking Paperen_US
dc.contributor.urlserapohkampungku@yahoo.com.myen_US
dc.contributor.urltalibon@gmail.comen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record