Show simple item record

dc.contributor.authorMuhammad Murtadha, Othman
dc.contributor.authorNurulazmi, Abd Rahman
dc.contributor.authorDaw salleh, Sasi
dc.contributor.authorIsmail, Musirin, Dr.
dc.date.accessioned2013-07-08T06:23:40Z
dc.date.available2013-07-08T06:23:40Z
dc.date.issued2012-06-06
dc.identifier.citationp. 470-474en_US
dc.identifier.isbn978-146730661-4
dc.identifier.urihttp://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=6230910
dc.identifier.urihttp://dspace.unimap.edu.my/123456789/26516
dc.descriptionLink to publisher's homepage at http://ieeexplore.ieee.org/en_US
dc.description.abstractThe capacity benefit margin (CBM) must be considered in the determination of power transfer so-called as the ATC. A new methodology of CBM considering interconnected system reliability will be discussed in this paper. This is to ensure that the ability of one area to accommodate generation deficiency in the other area depends on the reliability of interconnected systems that used as a medium of power transfer. A new approach of Pareto based evolutionary programming (EP) technique is used to provide several choices of optimum CBM values considering the reliability of interconnected system. The advantage is that the transmission providers is given a flexibility to select the best solution of CBM for all areas in order to compensate the generation deficiency occurring at different state of system operation in regards to the changes in economic requirement of load serving entity or resource planner. The effectiveness of the proposed method used in CBM determination is demonstrated on a case study of IEEE 24-bus Reliability Test System (RTS).en_US
dc.language.isoenen_US
dc.publisherInstitute of Electrical and Electronics Engineers (IEEE)en_US
dc.relation.ispartofseriesProceedings of the International Power Engineering and Optimization Conference (PEOCO 2012)en_US
dc.subjectAvailable transfer capability (ATC)en_US
dc.subjectCapacity benefit margin (CBM)en_US
dc.subjectInterconnected system reliabilityen_US
dc.subjectPareto based evolutionary programming (EP) techniqueen_US
dc.titleOptimal flexible solutions of capacity benefit margin considering interconnected system reliabilityen_US
dc.typeWorking Paperen_US
dc.contributor.urlmamat505my@yahoo.comen_US
dc.contributor.urlnurulazmi@unimap.edu.myen_US
dc.contributor.urlismailbm@salam.uitm.edu.my


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record