Search
Now showing items 111-113 of 113
Analysis on musyarakah model in managing interbank investment
(Universiti Malaysia Perlis (UniMAP), 2010-06-02)
Musyarakah contract is a joint venture investment that
considers profit and loss sharing and is a dynamic Islamic
principle in investment but there are hardly musyarakah
products in Malaysian banking system today. The ...
Potential failure (P-F) time estimation of the air compression
(Universiti Malaysia Perlis (UniMAP), 2010-06-02)
Air compressor is an important device to run the process of getting raw materials from the air in the ammonia (NH3)
plant. In order to avoid the equipments of air compressor breakdown, it is necessary to develop ...
Fuzzy lifetime in genetic algorithm against premature convergence
(Universiti Malaysia Perlis (UniMAP), 2010-06-02)
A large scale of design, control, scheduling or other
engineering problems results in solution of optimization
problems. In numerous areas of engineering there are
problems to which Genetic Algorithms (GAs) can ...