• Login
    View Item 
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The study of industrialised building system, the implementation barriers of PM2 advance building system.

    Thumbnail
    View/Open
    Abstract, Acknowledgement (788.1Kb)
    Introduction.pdf (648.9Kb)
    Literature Review.pdf (766.5Kb)
    Methodology.pdf (534.1Kb)
    Result and Discussion.pdf (887.0Kb)
    Conclusion and Recommendation.pdf (525.4Kb)
    Reference and Appendics.pdf (1.128Mb)
    Date
    2016-06
    Author
    Ahmad Makail, Ahmad Nadzri
    Metadata
    Show full item record
    Abstract
    The study is about the Industrialised Building System (IBS), The Implementation Barriers of PM2 Advance Building System. The study is made to determine the hindrance occurred using the IBS technique of PM2 panel. The objectives of the research are to study the level of awareness of usage of PM2 panel among the players in the construction project, to assess the problems arise in the usage and the implementation PM2 panel system and to give suggestion and recommendation to improve the PM2 panel system. The variables for this study are the knowledge among the project personnel, skills of local and foreign labourers, component supplier and the guidelines and building codes. Thirty respondents are sampled for this research. The method chosen for this research is survey. The survey is carried out by two ways including interviews and distribution of questionnaire among the targeted respondents. About twenty seven respondents have answered the questionnaire given in the survey conducted. The respondents are among the staff of the company involve in the construction in Perlis. They are from varies background which includes engineer, assistant engineer, quantity surveyor, technician, project manager, support staff and many more. The questionnaire answered are analyse using International Business Machines Statistical Package for the Social Sciences (IBM SPSS) version 23. The result shown that the main barriers to implement PM2 panel are basic knowledge of IBS, the cost and time of construction.
    URI
    http://dspace.unimap.edu.my:80/xmlui/handle/123456789/83217
    Collections
    • School of Environmental Engineering (FYP) [640]

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback
     

     

    Browse

    All of UniMAP Library Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback