Bluetooth Controlled Distribution Board for Circuit Testing in Electrical Wiring Lab
Date
2010-05-14Author
Wan Mohd Faizal, Wan Nik
Sharulnizam, Mohd Mukhtar
Abd Rahman, Mohd Saad, Assoc. Prof.
Metadata
Show full item recordAbstract
In the electrical wiring laboratory, students will perform a wiring installation on a specific bay. Before the wiring installation can be test, the current need to be supplied to the respective bay. This supply is controlled by a main DB in the laboratory. After completing the test the supply should be cut off. This is the main safety precaution that has to be taken in this lab.