Show simple item record

dc.contributor.authorSondermann, Wolfgang
dc.date.accessioned2024-02-21T08:29:20Z
dc.date.available2024-02-21T08:29:20Z
dc.date.issued2019-06
dc.identifier.citationThe Journal of the Institution of Engineers, Malaysia, vol.80 (2), 2019, pages 12-22en_US
dc.identifier.issn0126-513x
dc.identifier.urihttp://dspace.unimap.edu.my:80/xmlui/handle/123456789/80110
dc.descriptionLink to publisher’s homepage at https://www.myiem.org.my/en_US
dc.description.abstractWell-designed ground improvement options without compromising on stringent design criteria may effectively replace conventional foundation solutions for a wide range of applications involving heavy loads and structures sensitive to settlement. Case studies illustrate the application of different ground improvement methods used in different projects and soil conditions by adopting of advanced design considerations to achieve optimal solutions for the project and customers benefit. Beneficial returns in terms of lowering construction costs and shortening construction time with consistency in quality are discussed where applicable in relation to the required capabilities and experiences of an organisation to deliver the alternatives. Opportunity management gives the chance to achieve the project scopes for the client by optimizing cost, time and quality and recommendations are summarised to foster the chance to identify optimal geotechnical solutions.en_US
dc.language.isoenen_US
dc.publisherThe Institution of Engineers, Malaysia (IEM)en_US
dc.subject.otherGround improvementen_US
dc.titleGround improvement as alternative to piling - effective design solutions for heavily loaded structuresen_US
dc.typeArticleen_US
dc.identifier.urlhttps://www.myiem.org.my/


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record