• Login
    View Item 
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Manufacturing Engineering (FYP)
    • View Item
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Manufacturing Engineering (FYP)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Improvement of plastic roll change process on primary packing machine using Lean and Six Sigma approaches

    Thumbnail
    View/Open
    Abstract,Acknowledgement.pdf (482.7Kb)
    Introduction.pdf (331.4Kb)
    Literature Review.pdf (545.1Kb)
    Methodology.pdf (679.8Kb)
    Results and Discussion.pdf (797.8Kb)
    Conclusion and Recommendation.pdf (189.1Kb)
    Refference and Appendics.pdf (418.2Kb)
    Date
    2016-06
    Author
    Zulazha, Sehak
    Metadata
    Show full item record
    Abstract
    Continuous improvement process is a tradition of method improvement focusing the elimination of waste in all systems and process in an organisation. Continuous improvement has been an important part of manufacturing history since the humans are always looking for a better way to do their jobs or improve their tools. The current problem happened are the operator need to change the plastic roll average in a day about 3.667 times in operation hour and each time of change take about 3 minute. More than that, every time of plastic roll change, there will have a waste average about 32 of empty pack due to machine setup. The purposes of this improvement project are to reduce the number of plastic roll change process by used the lean six sigma approach on primary packaging machine. In order to identifying the defect, the Six Sigma approach has been used through its DMAIC method. For the improvement phase of this project, the Lean Manufacturing approach has been applied. The result after the improvement shows that the number of plastic roll change reduce from 3.667 to 3 times only and from the 3 times plastic roll change, there only 2 times of change are in operation hour and the other 1 are out of operation hour. The numbers of empty pack waste also shows the improvement from the current are 1366.06 pack to 465 pack. From the result, it shows the successful of applying Lean Six Sigma in way to get the minimum number of defect and at the same time increase the productivity.
    URI
    http://dspace.unimap.edu.my:80/xmlui/handle/123456789/70273
    Collections
    • School of Manufacturing Engineering (FYP) [338]

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback
     

     

    Browse

    All of UniMAP Library Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback