Search
Now showing items 1-2 of 2
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
(Praise Worthy Prize S.r.l., 2012-09)
This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant ...
Design and fabrication of a die for molding test press.
(Praise Worthy Prize S.r.l., 2012)
This project aims to design and fabricate an die for molding test press. Mold Test Press Machine uses the concept of Compression Molding/Hot Press Molding. This project will be handled from the beginning of the design until ...