dc.contributor.author | Norzila, Nayan | |
dc.date.accessioned | 2014-09-12T07:15:42Z | |
dc.date.available | 2014-09-12T07:15:42Z | |
dc.date.issued | 2010-05 | |
dc.identifier.uri | http://dspace.unimap.edu.my:80/dspace/handle/123456789/37116 | |
dc.description | Access is limited to UniMAP community. | en_US |
dc.description.abstract | This final year project is to describe about the process improvement on the manufacturing shop floor. In this work, to find out more, research had been done in one of manufacturing industry to identify process need to be improved. The goal of this project is to do an improvement in the autoclave curing process involved in a manufacturing company, Asian Composite Malaysia (ACM). The objectives are to study details about autoclave process and propose improvement to reduce defects parts in autoclave. These actions often follow a specific methodology or strategy to create successful results. The method used in this project is Seven Basic Tools of Quality such as brainstorming, cause and effect diagram (Ishikawa), flow chart and control chart to implement the improvement. The result shows the reducing of total part or panel of bag leak and thermocouple (TC) disable after implementing the corrective action and new improvement in the process involved. It was explain in chapter experimental and analysis in details. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universiti Malaysia Perlis (UniMAP) | en_US |
dc.subject | Autoclave -- Design and consruction | en_US |
dc.subject | Autoclave curing process | en_US |
dc.subject | Reduce defects | en_US |
dc.title | A process improvement on the autoclave process at Asian Composite Manufacturing, Bukit Kayu Hitam, Kedah | en_US |
dc.type | Learning Object | en_US |
dc.contributor.advisor | Nurul Ikhmar | en_US |
dc.publisher.department | School of Manufacturing Engineering | en_US |