Show simple item record

dc.contributor.authorZuhairi, Abd. Hamid
dc.contributor.authorMarshall-Ponting, Amanda
dc.contributor.authorAhmad, Tarmizi Haron
dc.contributor.authorNasly, Mohamed Ali
dc.contributor.authorZahrizan, Z.
dc.date.accessioned2014-08-19T04:23:31Z
dc.date.available2014-08-19T04:23:31Z
dc.date.issued2014-06
dc.identifier.citationThe Journal of the Institution of Engineers, Malaysia, vol. 75(1), 2014, pages 1-10en_US
dc.identifier.issn0126-513X
dc.identifier.urihttp://dspace.unimap.edu.my:80/dspace/handle/123456789/36825
dc.descriptionLink to publisher’s homepages at http://www.myiem.org.my/en_US
dc.description.abstractIn Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. This is one of the many benefits that they could gain and resulting in increased productivity. Despite these benefits, the implementation of BIM in the Malaysian construction industry is still lagging behind Singapore, for instance. Thus, it warrants a study such as the present to determine what are the actual barriers that hamper its implementation and what are the driving factors that could enhance its pace of implementation in the Malaysian construction industry. In this study, a questionnaire survey based on Convenience Sampling Method was carried out to gather the possible barriers and driving factors for BIM implementation among the Malaysian construction players. Additionally, Relative Importance Indices (RII) were used to analyse the data obtained and to identify those barriers and driving factors for the implementation of BIM in this country. Consequently, results of this study revealed that the main barriers for implementing the BIM are: 1) Lack of knowledge about BIM, 2) Reluctance and/or no insistence shown by the Malaysian construction industry players (Clients, Contractors and Consultants alike) on the use or implementation of BIM. The driving factors, on the other hand, that could lead to the speeding up of the implementation of BIM are: 1) Support and enforcing the implementation of BIM by the Government, 2) promote BIM training program and 3) Initiatives of senior management of the related industry players. In conclusion, for successful wide spread application of BIM in Malaysia, a good push from the government alone is far from enough. All other construction industry players mentioned must assume their roles well in promoting the use of BIM in their construction projects.en_US
dc.language.isoenen_US
dc.publisherThe Institution of Engineers, Malaysia (IEM)en_US
dc.subjectBuilding Information Modellingen_US
dc.subjectBIMen_US
dc.subjectMalaysian Construction Industryen_US
dc.subjectBarriersen_US
dc.subjectDriving Factorsen_US
dc.titleExploring the barriers and driving factors in implementing building Information Modelling (BIM) in the malaysian construction industry - a preliminary studyen_US
dc.typeOtheren_US
dc.contributor.urlzahrizan@ump.edu.myen_US
dc.contributor.urlnasly@ump.edu.myen_US
dc.contributor.urlahmadtarmizi@ump.edu.myen_US
dc.contributor.urlA.J.Marshall-Ponting@salford.ac.uken_US
dc.contributor.urlzuhairi@cidb.gov.myen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record