dc.description.abstractConstruction resources are fundamental requirement for any construction project to achieve project completion within estimated budget. The fundamental construction resources include material, manpower, machinery and money. These resources have significant effect on construction cost. Construction cost is now a days facing problem of coverrun. Hence, it is very ctitical to assess impact of various resources on cost overrun. Data collection was carried out using structured questionnaire survey amonst client, consultant and contractors in southern and central region of Malaysia. A total of 234 questionnaire were collected including 128 in southern part and 106 in central part. Data was analayzed with PLS path modeling using SmartPLS v2.0 software. The result showed that resources have significant effect on cost overrun. Extracted variance showed that in southern region, around 40% of cost variation can be caused because of construction resource while in central region variance is achieved as 59%. Material resource was found as common and most significant resource in southern and central region. GoF value was achieved as 0.529 and 0.566 for southern and central regions respectively confirming the explaining power of the proposed path model.en_US
dc.language.isoenen_US
dc.publisherMalaysian Technical Universities Network (MTUN)en_US
dc.relation.ispartofseriesProceeding of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012;
dc.subjectConstruction resourcesen_US
dc.subjectCentral Malaysiaen_US
dc.subjectSouthern Malaysiaen_US
dc.subjectPLS path modelingen_US
dc.titleAssessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysiaen_US
dc.typeWorking Paperen_US
dc.contributor.urlaftabm78@hotmail.comen_US
dc.contributor.urlismailar@uthm.edu.myen_US
dc.contributor.urlade.asmi@bakrie.ac.iden_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record