Browsing Journal of Engineering Research and Education (JERE) by Subject "SMED"
Now showing items 1-2 of 2
-
Application of fuzzy AHP for setup reduction in manufacturing industry
(Universiti Malaysia Perlis (UniMAP), 2016)Traditionally, setup time is regarded as one of the most expensive costs that manufacturing firms and organizations had to face including for the optimizations of the setup processes and for the huge production lots. Faster ... -
Setup Time Reduction for 5-Axis Composite Material’s Trimming Machine by Using a New Framework of SMED Integrated with ECSC Concept
(Universiti Malaysia Perlis (UniMAP), 2017)To survive in today’s competitive world; industries and manufacturers need to find ways and alternatives to reduce the production time and costs in order to boost the operating performance, product quality and flexibility. ...