Search
Now showing items 1-1 of 1
The performance of a prefaricated vertical drain trial embankment
(The Institution of Engineers, Malaysia (IEM), 2011-09)
Two fuel scale trial embankments were constructed to a height of 3.65 m over the soft marine clay at Juru, Butterworth, Pulai Pinang. One of the embankments was improved using prefabricated vertical drain (PVD), and the ...