Please use this identifier to cite or link to this item: http://dspace.unimap.edu.my:80/xmlui/handle/123456789/8519
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMohd Razaki, Abdullah-
dc.contributor.authorIsmail, Abd Rahman-
dc.contributor.authorAdi Asmi, Abd Azis-
dc.date.accessioned2010-08-10T10:05:52Z-
dc.date.available2010-08-10T10:05:52Z-
dc.date.issued2009-06-20-
dc.identifier.citationp.9-13en_US
dc.identifier.urihttp://dspace.unimap.edu.my/123456789/8519-
dc.descriptionMUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.en_US
dc.description.abstractThe construction industry is a major catalyst to the growth of the nation’s socio economic development. The frequent delay of the large construction project has been a phenomenon and it effects the implementation of the strategic planning. This paper presents the findings of survey of dominant cause of delay in large MARA (Majlis Amanah Rakyat) construction project in the perspective of project management consultants (PMC). Respondents of this survey were personnel that work as PMC ranging from the executives, managerial and supporting groups. The result revealed that the five most significant delay causes as seen by PMC were cash flow and financial difficulties faced by contractors, contractor's poor site management, inadequate contractor experience, shortage of site workers and ineffective planning and scheduling by contractors. Hopefully, the findings of this study will at least shade some lights to the problems faced by MARA large construction project and effort can be taken to improve it.en_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Pahang (UMP)en_US
dc.relation.ispartofseriesProceedings of the Malaysian Technical Universities Conference on Engineering and Technology (MUCEET) 2009en_US
dc.subjectMUCEETen_US
dc.subjectMalaysian Technical Universities Conference on Engineering and Technologyen_US
dc.subjectConstruction delayen_US
dc.subjectMARA construction projecten_US
dc.titleDelay in large MARA construction projects based on project management consultant perspectiveen_US
dc.typeWorking Paperen_US
dc.contributor.urlabdullahrazaki@yahoo.comen_US
Appears in Collections:Conference Papers

Files in This Item:
File Description SizeFormat 
009-013.pdf192.57 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.