Statistics
Total Visits
| Views | |
|---|---|
| Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry | 107 |
Total Visits per Month
| May 2025 | June 2025 | July 2025 | August 2025 | September 2025 | October 2025 | November 2025 | |
|---|---|---|---|---|---|---|---|
| Cycle time variation analysis on shop floor production line – a case study in medical device manufacturing industry | 4 | 0 | 1 | 2 | 2 | 3 | 3 |
File Downloads
| Views | |
|---|---|
| Abstract,Acknowledgement.pdf | 10 |
| Literature Review.pdf | 8 |
| Introduction.pdf | 5 |
| Methodology.pdf | 4 |
| Results and Discussion.pdf | 4 |
| Conclusion and Recommendation.pdf | 3 |
| Refference and Appendics.pdf | 2 |
Top Country Views
| Views | |
|---|---|
| United States | 31 |
| Vietnam | 10 |
| Brazil | 9 |
| Ireland | 9 |
| Malaysia | 7 |
| Australia | 6 |
| Sweden | 6 |
| China | 4 |
| Singapore | 3 |
| Argentina | 2 |
Top City Views
| Views | |
|---|---|
| Dublin | 9 |
| Hanoi | 9 |
| Boardman | 4 |
| San Mateo | 4 |
| Gopeng | 3 |
| Hangzhou | 2 |
| Singapore | 2 |
| Auburn | 1 |
| Balashikha | 1 |
| Barreiros | 1 |