Please use this identifier to cite or link to this item: http://dspace.unimap.edu.my:80/xmlui/handle/123456789/52761
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMohd Syazwan Faiz, Soberi-
dc.contributor.authorRosmaini, Ahmad-
dc.contributor.authorMuhammad Iqbal, Muhammad Hussain-
dc.contributor.authorN., Muhammad-
dc.date.accessioned2018-05-04T07:13:12Z-
dc.date.available2018-05-04T07:13:12Z-
dc.date.issued2017-
dc.identifier.citationJournal of Engineering Research and Education, vol.9, 2017, pages 29-40en_US
dc.identifier.issn1823-2981-
dc.identifier.urihttp://dspace.unimap.edu.my:80/xmlui/handle/123456789/52761-
dc.descriptionLink to publisher's homepage at http://jere.unimap.edu.myen_US
dc.description.abstractTo survive in today’s competitive world; industries and manufacturers need to find ways and alternatives to reduce the production time and costs in order to boost the operating performance, product quality and flexibility. One of the alternatives is to reduce the setup time. For many decades, extensive attention has been given to the action of reducing the setup and changeover time and most of them are practicing the “famous” Single Minute Exchange of Dies (SMED), developed by Shigeo Shingo in 1960s. Despite that, many companies are still having problems in implementing the SMED because of there is no specific guideline to apply the method. This paper proposed a new framework of SMED with detailed steps to facilitate lean practitioner in implementing it. The new SMED framework will helps decision maker in choosing the best options whether to eliminate, combine, simplify or convert the setup activities from internal to external activities by applying Eliminate, Combine, Simplify and Convert (ECSC) concept. A case study in composite aircraft manufacturing company is used to exemplify the approach. The data analysis was presented to show the final results. The result validates the aptitudes of the proposed method in reducing the setup time.en_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Perlis (UniMAP)en_US
dc.subjectSetup Time Reductionen_US
dc.subjectChangeoveren_US
dc.subjectSingle Minute Exchange of Diesen_US
dc.subjectSMEDen_US
dc.subjectLean Manufacturingen_US
dc.subjectECSC Concepten_US
dc.titleSetup Time Reduction for 5-Axis Composite Material’s Trimming Machine by Using a New Framework of SMED Integrated with ECSC Concepten_US
dc.typeArticleen_US
dc.contributor.urlsyazwanfaizmaat@yahoo.comen_US
Appears in Collections:Journal of Engineering Research and Education (JERE)

Files in This Item:
File Description SizeFormat 
Setup Time Reduction for 5-Axis Composite Material’s Trimming.pdf292.09 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.