Please use this identifier to cite or link to this item:
http://dspace.unimap.edu.my:80/xmlui/handle/123456789/44225
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sin, Tan Chan | - |
dc.contributor.author | Usubamatov, Ryspek | - |
dc.contributor.author | Fairuz, M. A. | - |
dc.contributor.author | Mohd Fidzwan, Md. Amin Hamzas | - |
dc.date.accessioned | 2016-11-30T04:54:51Z | - |
dc.date.available | 2016-11-30T04:54:51Z | - |
dc.date.issued | 2014 | - |
dc.identifier.citation | International Review of Mechanical Engineering, vol.8 (4), 2014, pages 772-778 | en_US |
dc.identifier.issn | 1970-8734 | - |
dc.identifier.issn | 1970-8742 (Online) | - |
dc.identifier.uri | http://www.praiseworthyprize.org/jsm/index.php?journal=ireme&page=article&op=view&path%5B%5D=15799 | - |
dc.identifier.uri | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/44225 | - |
dc.description | Link to publisher's homepage at http://www.praiseworthyprize.org | en_US |
dc.description.abstract | Industrial automated production flow line focus on productivity assessment and analysis since it present an important indicator of company profit and performance. Serial structure of production automated flow line widely implement in automated production sector for mass production. High accuracy yield of mathematical model of productivity is important for forecast work to increase the profits of company. This paper presents application of Witness software simulation for mathematical model of productivity with different reliability level of workstations and mechanisms, bottleneck machining time, and defected parts parameters for serial structure automated to validate this mathematical model which produce higher accuracy forecast result compare to current mathematical model of productivity which not consider few of productivity losses parameters. Validation through software simulation for mathematical model is important since there is lack of simulation for this model in current research for mathematical model. The simulation result for model is show higher accuracy which near to actual simulation productivity and the current mathematical model is replace by mathematical model with different reliability level for productivity forecast in academic and industries due to accuracy reason. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Praise Worthy Prize | en_US |
dc.subject | Production Flow Line | en_US |
dc.subject | Productivity | en_US |
dc.subject | Reliability | en_US |
dc.subject | Serial Structure | en_US |
dc.subject | WITNESS Simulation | en_US |
dc.title | Mathematical model of productivity with reliability and losses parameters for serial structure linear production automated flow line: a simulation analysis | en_US |
dc.type | Article | en_US |
dc.contributor.url | cstan@unimap.edu.my | en_US |
Appears in Collections: | Tan Chan Sin, Ts. Dr. Mohd Fidzwan Md Amin Hamzas, Encik Ryspek Usubamatov, Prof. Dr. |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mathematical models for the productivity rate.pdf | 173.26 kB | Adobe PDF | View/Open |
Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.