dc.contributor.authorYusraa, yusoff-
dc.date.accessioned2016-03-04T03:10:24Z-
dc.date.available2016-03-04T03:10:24Z-
dc.date.issued2010-
dc.identifier.urihttp://dspace.unimap.edu.my:80/xmlui/handle/123456789/40918-
dc.descriptionAccess is limited to UniMAP communityen_US
dc.description.abstractA rapid changeover capability is widely acknowledged as an essential prerequisite to flexible, responsive small batch manufacturing. Its importance in mass customization is recognized, where minimal losses need to be incurred as manufacture switches between differing products. Retrospective improvement of existing changeover practice is often undertaken, arising from pressure to respond better to customer demands, wherein improvement personnel frequently engage Shigeo Shingo’s Single Minute Exchange of Die (SMED) methodology to achieve better performance. Irrespective of the improvement methodology that is employed this paper assesses two fundamental mechanisms by which better changeovers might be achieved. First, improvement can occur by altering when tasks are conducted. Better allocation of tasks to the resources necessary to conduct them is sought, where the tasks themselves remain essentially unchanged. The second mechanism is to seek structural change to existing tasks, thereby intrinsically enabling them to be completed more quickly. These two mechanisms are described in relation to use of the SMED methodology, where it is argued that, by reinterpreting Shingo’s work, greater clarity of potential improvement options can be gained. Index Terms Changeover reduction, improvement methodology, manufacturing flexibility, manufacturing systems, run-up, SMED, its current format are largely overcome, enabling the changeover practitioner to gain a fresh perspective on improvement opportunities, and to be able to prioritize them more readily. Notably, it is considered that tasks need not always be reallocated into external time if useful time reductions are to be made. Attention is given to factors that can limit task reallocation. The authors’ reinterpretation of Shingo’s work is valid in changeover situations when an extensive run-up period occursen_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Perlis (UniMAP)en_US
dc.subjectChangeover timeen_US
dc.subjectChangeoveren_US
dc.subjectSingle Minute Exchange of Dies (SMES)en_US
dc.subjectManufacturing industryen_US
dc.titleChangeover time reduction for die cut machineen_US
dc.typeLearning Objecten_US
dc.contributor.advisorNooraizedfiza Bt. Zainonen_US
dc.publisher.departmentSchool of Manufacturing Engineeringen_US
Appears in Collections:School of Manufacturing Engineering (FYP)

Files in This Item:
File Description SizeFormat 
Abstract,Acknowledgement.pdf255.47 kBAdobe PDFView/Open
Introduction.pdf264.54 kBAdobe PDFView/Open
Literature Review.pdf485.52 kBAdobe PDFView/Open
Methodology.pdf454.1 kBAdobe PDFView/Open
Results and Discussion.pdf398.45 kBAdobe PDFView/Open
Conclusion and Recommendation.pdf248.66 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.