Please use this identifier to cite or link to this item: http://dspace.unimap.edu.my:80/xmlui/handle/123456789/40885
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNorshakinah, Saad-
dc.date.accessioned2016-02-21T08:23:46Z-
dc.date.available2016-02-21T08:23:46Z-
dc.date.issued2010-03-
dc.identifier.urihttp://dspace.unimap.edu.my:80/xmlui/handle/123456789/40885-
dc.descriptionAccess is limited to UniMAP community.en_US
dc.description.abstractQuality Control (QC) are scientific management tools, which are uncomplicated used and easy to understand. It forms the fundamental foundation for all problem solving and quality control activities. The most important of this study is to identify the problem in detail and classify root cause that most effect in manufacturing shop floor. Based on the problem study had design and develops a workable solution with implement the specific suggestion to solve the problem at production line. Asian Composites Manufacturing Sdn. Bhd is specializing in manufacturing advanced composite component for aerospace application. As a manufacturing industry have a problem occur that related with products manufacture especially in trimming process by Waterjet machine. The defect occur included delamination and void, fiber breakout or exposed damaged, periphery undersize/oversize, drill holes oversize, Surface roughness, wrong Waterjet program was used, drilled holed shifted , and excess (wrong/undersize/oversize). Based on problem faces this studies have focus on defect of periphery undersize, periphery oversize, delamination and voids to achieve the objective of study. QC Tools were used such as ishikawa diagram, pareto chart, histogram, bar chart and others to identify the root causes and monitoring result after implementation of Preventive Maintenance (PM), Corrective Maintenance (CM) and Total Preventive Maintenance (TPM) as a solution. From these studies has to allow more focus on problem statement study, interpreting the results, develop the specific solution to solve the problem and implement action plans for the improvement of quality. At the end of project, part trim defect at Waterjet machine have been reduced.en_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Perlis (UniMAP)en_US
dc.subjectShop flooren_US
dc.subjectQuality Control (QC)en_US
dc.subjectManufacturing shop flooren_US
dc.subjectManufacturingen_US
dc.subjectShoop floor -- Analysisen_US
dc.titleA manufacturing shop floor problemen_US
dc.typeLearning Objecten_US
dc.contributor.advisorAzmi Harunen_US
dc.publisher.departmentSchool of Manufacturing Engineeringen_US
Appears in Collections:School of Manufacturing Engineering (FYP)

Files in This Item:
File Description SizeFormat 
Abstract,Acknowledgement.pdf223.06 kBAdobe PDFView/Open
Introduction.pdf239.11 kBAdobe PDFView/Open
Literature Review.pdf831.14 kBAdobe PDFView/Open
Methodology.pdf277.82 kBAdobe PDFView/Open
Results and Discussion.pdf543.08 kBAdobe PDFView/Open
Conclusion and Recommendation.pdf220.29 kBAdobe PDFView/Open
Reference and Appendix.pdf727.12 kBAdobe PDFView/Open


Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.