Please use this identifier to cite or link to this item:
http://dspace.unimap.edu.my:80/xmlui/handle/123456789/30666
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Zahereel Ishwar, Abdul Khalib | - |
dc.contributor.author | R. Badlishah, Ahmad, Prof. Dr. | - |
dc.contributor.author | Ong, Bi Lynn | - |
dc.date.accessioned | 2013-12-20T03:27:52Z | - |
dc.date.available | 2013-12-20T03:27:52Z | - |
dc.date.issued | 2012-11-20 | - |
dc.identifier.uri | http://dspace.unimap.edu.my/123456789/30666 | - |
dc.description | Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. | en_US |
dc.description.abstract | Soft real time system tolerates missing deadline to a certain limit. However, enhancing the deadline meeting ratio (DMTR) of a soft real time system is definitely favorable as it will increase the system performance. In this paper we present a new non-preemptive dynamic scheduling algorithm for soft real time application with the ultimate aim of increasing the deadline meeting ratio of the evergreen Earliest Deadline First (EDF) algorithm during overload condition while maintaining the excellent performance it poses during normal load. Our approach, grouped jobs with near deadlines together using our novel algorithm and schedule the jobs within a group using another novel approach has boost the performance during overload. We named the approach Group, Utilization and Deadline Tolerance EDF (gutEDF). We will present results comparing the deadline meeting ratio of gutEDF and EDF under different deadline tolerance values and the Deadline Meeting Ratio improvement of the algorithm. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Malaysian Technical Universities Network (MTUN) | en_US |
dc.relation.ispartofseries | Proceedings of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012; | - |
dc.subject | Group scheduling | en_US |
dc.subject | Soft real time | en_US |
dc.subject | Earliest Deadline First (EDF) | en_US |
dc.subject | GutEDF | en_US |
dc.title | A non-preemptive soft real time scheduler | en_US |
dc.type | Working Paper | en_US |
dc.contributor.url | zahereel @unimap.edu.my | en_US |
Appears in Collections: | Conference Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ICT 07.pdf | Access is limited to UniMAP community | 971.2 kB | Adobe PDF | View/Open |
Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.