Please use this identifier to cite or link to this item:
http://dspace.unimap.edu.my:80/xmlui/handle/123456789/26516
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Muhammad Murtadha, Othman | - |
dc.contributor.author | Nurulazmi, Abd Rahman | - |
dc.contributor.author | Daw salleh, Sasi | - |
dc.contributor.author | Ismail, Musirin, Dr. | - |
dc.date.accessioned | 2013-07-08T06:23:40Z | - |
dc.date.available | 2013-07-08T06:23:40Z | - |
dc.date.issued | 2012-06-06 | - |
dc.identifier.citation | p. 470-474 | en_US |
dc.identifier.isbn | 978-146730661-4 | - |
dc.identifier.uri | http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=6230910 | - |
dc.identifier.uri | http://dspace.unimap.edu.my/123456789/26516 | - |
dc.description | Link to publisher's homepage at http://ieeexplore.ieee.org/ | en_US |
dc.description.abstract | The capacity benefit margin (CBM) must be considered in the determination of power transfer so-called as the ATC. A new methodology of CBM considering interconnected system reliability will be discussed in this paper. This is to ensure that the ability of one area to accommodate generation deficiency in the other area depends on the reliability of interconnected systems that used as a medium of power transfer. A new approach of Pareto based evolutionary programming (EP) technique is used to provide several choices of optimum CBM values considering the reliability of interconnected system. The advantage is that the transmission providers is given a flexibility to select the best solution of CBM for all areas in order to compensate the generation deficiency occurring at different state of system operation in regards to the changes in economic requirement of load serving entity or resource planner. The effectiveness of the proposed method used in CBM determination is demonstrated on a case study of IEEE 24-bus Reliability Test System (RTS). | en_US |
dc.language.iso | en | en_US |
dc.publisher | Institute of Electrical and Electronics Engineers (IEEE) | en_US |
dc.relation.ispartofseries | Proceedings of the International Power Engineering and Optimization Conference (PEOCO 2012) | en_US |
dc.subject | Available transfer capability (ATC) | en_US |
dc.subject | Capacity benefit margin (CBM) | en_US |
dc.subject | Interconnected system reliability | en_US |
dc.subject | Pareto based evolutionary programming (EP) technique | en_US |
dc.title | Optimal flexible solutions of capacity benefit margin considering interconnected system reliability | en_US |
dc.type | Working Paper | en_US |
dc.contributor.url | mamat505my@yahoo.com | en_US |
dc.contributor.url | nurulazmi@unimap.edu.my | en_US |
dc.contributor.url | ismailbm@salam.uitm.edu.my | - |
Appears in Collections: | Conference Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Optimal flexible solutions of capacity benefit margin considering interconnected system reliability.pdf | 9.31 kB | Adobe PDF | View/Open |
Items in UniMAP Library Digital Repository are protected by copyright, with all rights reserved, unless otherwise indicated.