    • Development of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4 

      Mohd Fidzwan, Md Amin Hamzas; Ahmad Bareduan, Salleh; Liyana, Tajul; Mohd Sabri, Hussin; Zailani, Zainal Abidin; Hasnul, Hadi (Praise Worthy Prize S.r.l., 2012-03)
      This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 where M1 and M4 have ...
    • Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop 

      Mohd Fidzwan, Md Amin Hamzas; Ahmad Bareduan, Salleh; Mohd Sabri, Hussin; M. J., Hasnul; Asmawi, Sanuddin; Zailani, Zainal Abidin (Praise Worthy Prize S.r.l., 2012-09)
      This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant ...