Now showing items 1-1 of 1

    • Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop 

      Mohd Fidzwan, Md Amin Hamzas; Ahmad Bareduan, Salleh; Mohd Sabri, Hussin; M. J., Hasnul; Asmawi, Sanuddin; Zailani, Zainal Abidin (Praise Worthy Prize S.r.l., 2012-09)
      This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant ...