Search
Now showing items 1-2 of 2
Development of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4
(Praise Worthy Prize S.r.l., 2012-03)
This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 where M1 and M4 have ...
Classroom comfort ability assessment: A case study
(Praise Worthy Prize S.r.l., 2012-03)
his study was conducted to evaluate the comfort level of an air-conditioned classroom at the School of Manufacturing Engineering campus using objective measurement, subjective assessment and Computational Fluid Dynamics ...