Development of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4
(Praise Worthy Prize S.r.l., 2012-03)This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 where M1 and M4 have ... -
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
(Praise Worthy Prize S.r.l., 2012-09)This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant ...